Home | Contacts
 
 
  Projects  
 
 
 
   
 
       
72. Chittagong Port Trade Facilitation Project- Detailed Design and Supervision of Construction of Port Service Road , Oil Waste Receptor and Oil Waste Plant and Re-Construction / Upgrading of Internal Roads
       
  Country : Bangladesh
  Name of the client : Chittagong Port Authority
  Name of the Funding Agency : Asian Development Bank (ADB)
  Project Duration : April 2006 – June 2008
  Scope of the Project :

Preparation of detailed engineering designs for a new port service road, a oil waste separation plant, an office building for the port environmental unit, which include storage room for facilities to handle oil spill clearing equipment and a small laboratory to test water quality; Preparation of detailed designs for rehabilitation/up-gradation of the internal circulation roads, entry and exit points, the bridge connecting the general cargo area and the container terminals; Preparation of technical specifications for oil waste collector/receptor facility, and equipment and substances to handle oil spills; Preparation of bidding documents for construction works explained in and procurement of equipment and substances explained in and supervision the construction works and supervision of the afore-mentioned works and supply of goods.

  Services Provided :
  • Preparation of detailed engineering designs;
  • Preparation of bidding document, evaluation and selection of contractor;
  • Supervision of construction and operational of waste oil treatment facilities;
  • Implementation arrangement; and
  • Report writing.
       
     
© HB Consultants Ltd., Dhaka, Bangladesh.